Expert Surface Treatments
Based in Eastleigh, Hampshire we provide expert blast cleaning and protective coating services for clients across the South of England.
Our Previous Projects
At Hi-Tech Surface Treatment Ltd we have worked on many projects for clients across the South of England including BAA, Esso-Exxon, Network Rail, RNLI, The Highways Agency, the Thames Tunnel, Stansted Airport, BBC and the Olympic Stadium to name a few. Our gallery below shows some of the projects we have previously completed.
We provide a range of expert services from grit blasting to site painting. Contact our friendly, professional team to see how we can help you.
London Waterloo Station - Infill steel.
Project completed October 2018
Network Rail XN90 N1 and N17 corrosion and fire protection paint systems
Paint system:
Off site
XN90 N1:
Grit blast SA 3
Thermal spray zinc @ 100 microns
Macropoxy L574 @ 25 microns
Macropoxy C402 @ 150 microns
Acrolon C237 ral 7040 applied at 50 microns dry film thickness
N17
Macropoxy L674 @ 50 microns
Firetex fx1003 @ 2 hour rating
Acrolon C237 ral 7040 @ 150 microns
On site, post construction, paint system applied to welded modifications and repairs to transport and erection damage
Crossrail Plumstead Maintenance and accommodation facilities
Project completed October 2018
Network Rail N17 fire protective paint system (to achieve 60 minute fire rating)
Paint system:
Off site
Grit blast SA 2.5
Macropoxy L674 @ 50 microns
Firetex FX2003 to achieve 60 minuet fire rating
Acrolon C237 ral 7035 / 3020 – basic, decorative and high decorative finishes
On site, post construction, repairs to transport and erection damage plus fire proofing connections.
London Bridge Station Tooley Street Facade
Project completed December 2017
Network Rail XN90 N1 paint system applied, including Thermal spray aluminium
Paint system:
Off site
Grit blast SA 3
Thermal spray aluminium 100 micron minimum thickness
Intergard 214 applied at 25 microns
Intercure 384 @ 150 microns
Interfine 691 ral 7012 applied at 50 microns
On site, post construction, repairs to transport and erection damage plus full cosmetic recoat
Marwell Zoo - Tropical House walk way.
Project completed Summer 2017
High build epoxy system for long term corrosion protection in warm humid conditions year round
Paint system:
Off site
Grit blast SA 2.5
Interzone 954 applied at 450 microns minimum dry film thickness
Interthane 870 ral 9005 applied at 50 micorns dry film thickness
On site, post construction, paint system applied to welded modifications and repairs to transport and erection damage